More actions
add status to infobox |
m Text replacement - "<gallery>" to "<gallery mode=packed-hover>" |
||
(12 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Stations]] | [[Category:Stations]] | ||
{{ | {{Station | ||
| | |image=Day=Abermoore Unfinished.png;Night=Abermoore Unfinished Night.png;Platforms=Abermoore Unfinished Platform View.jpg | ||
| | |preceding_diesel=[[Llanfairpwllgwyngyll]] | ||
| | |abbreviation=ABM | ||
|platforms=5 | |||
|tracks=6 | |||
| | |||
| | |||
|dispatching=No | |dispatching=No | ||
|status=removed | |status=removed | ||
}} | }} | ||
'''Abermoore''' was a terminus station past [[Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch|Llanfairpwllgwyngyll]]. It housed 5 platforms. | '''Abermoore''' was a terminus station past [[Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch|Llanfairpwllgwyngyll]]. It housed 5 platforms. | ||
Line 18: | Line 13: | ||
The station, along with the line to Llanfair and the unfinished double-track line, was removed in April of 2024 due to its creator, [[Staff/RAYE|RAYE]] resigning<ref>https://discord.com/channels/1113532700121378896/1113532700121378899/1229883048800288799</ref>. | The station, along with the line to Llanfair and the unfinished double-track line, was removed in April of 2024 due to its creator, [[Staff/RAYE|RAYE]] resigning<ref>https://discord.com/channels/1113532700121378896/1113532700121378899/1229883048800288799</ref>. | ||
In addition to the single-track line from Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch, there was also an unfinished double-track line terminating here that was added along with the station. It ran through the sea, was partially embanked on sand and ended after a few hundred meters. | In addition to the single-track line from [[Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch]], there was also an unfinished double-track line terminating here that was added along with the station. It ran through the sea, was partially embanked on sand and ended after a few hundred meters. This line was the Newhaven-On-Sea line, which was never entirely finished. | ||
In its state before removal, the station was floating above the sea and its switches couldn't be controlled without assistance from a developer. | In its state before removal, the station was floating above the sea and its switches couldn't be controlled without assistance from a developer with access to administrative tools. | ||
== Trivia == | == Trivia == | ||
* The name of the station was chosen through a name competition. | * The name of the station was chosen through a name competition. | ||
** In the announcement of the name competition, the station was described as a "grand terminus station which is semi-subsurface and is next to the ocean".<ref>https://discord.com/channels/1113532700121378896/1116458853610037298/1192581438114103316</ref> | ** In the announcement of the name competition, the station was described as a "grand terminus station which is semi-subsurface and is next to the ocean".<ref>https://discord.com/channels/1113532700121378896/1116458853610037298/1192581438114103316</ref> | ||
*Abermoore housed the only animated motorised points. | |||
*The track was not equipped with 3rd rail electrification, therefore electrified units such as the [[Class 377]] and [[Class 450]] could not proceed into the section. | |||
== Gallery == | == Gallery == | ||
<gallery> | <gallery mode=packed-hover> | ||
File:Abermoore Junction Unfinished.png|The junction near the station where two lines separate. | File:AbermooreOverview.png|A closeup of the Abermoore station | ||
File:Abermoore Column Arch.png|An arch of the station ceiling with emblems showing the flags of England, Wales and Scotland | File:AbermooreRoofStructure.png|The roof structure of Abermoore | ||
File:Abermoore pillars.jpeg|Side platform separated by the Pillars | File:AbermoorePointwork.png|Pointwork seen in the Abermoore platforms | ||
File:AbermoorePlatform.png|Sand being blown over onto the track in an Abermoore platform | |||
File:Abermoore Junction Unfinished.png|The junction near the station where two lines separate | |||
File:AbermoorePattern.png|The pattern shown on the station shelter supports | |||
File:Abermoore Column Arch.png|An arch of the station ceiling with emblems showing the flags of England, Wales and Scotland | |||
File:Abermoore pillars.jpeg|Side platform separated by the Pillars | |||
File:Abermoore with mk5.png|Abermoore side platform with MK5 set adjacent | File:Abermoore with mk5.png|Abermoore side platform with MK5 set adjacent | ||
File:AbermooreWithRTShst.png|Two [[RTS]] Scotrail HSTs ready to depart Abermoore | |||
File:AbermooreHST.png|HST exiting the early stages of Abermoore in the main game | |||
</gallery> | </gallery> | ||
== References == | == References == | ||
<references /> | |||
{{StationsNavplate}} |
Latest revision as of 15:47, 10 November 2024
Abermoore was a terminus station past Llanfairpwllgwyngyll. It housed 5 platforms.
The station, along with the line to Llanfair and the unfinished double-track line, was removed in April of 2024 due to its creator, RAYE resigning[1].
In addition to the single-track line from Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch, there was also an unfinished double-track line terminating here that was added along with the station. It ran through the sea, was partially embanked on sand and ended after a few hundred meters. This line was the Newhaven-On-Sea line, which was never entirely finished.
In its state before removal, the station was floating above the sea and its switches couldn't be controlled without assistance from a developer with access to administrative tools.
Trivia
- The name of the station was chosen through a name competition.
- In the announcement of the name competition, the station was described as a "grand terminus station which is semi-subsurface and is next to the ocean".[2]
- Abermoore housed the only animated motorised points.
- The track was not equipped with 3rd rail electrification, therefore electrified units such as the Class 377 and Class 450 could not proceed into the section.
Gallery
-
A closeup of the Abermoore station
-
The roof structure of Abermoore
-
Pointwork seen in the Abermoore platforms
-
Sand being blown over onto the track in an Abermoore platform
-
The junction near the station where two lines separate
-
The pattern shown on the station shelter supports
-
An arch of the station ceiling with emblems showing the flags of England, Wales and Scotland
-
Side platform separated by the Pillars
-
Abermoore side platform with MK5 set adjacent
-
Two RTS Scotrail HSTs ready to depart Abermoore
-
HST exiting the early stages of Abermoore in the main game